
Low investment, quick economic return and high production capacity
Flexible process flow and stable equipment operation
High mixing homogeneity(cv<5%) and low residue
Full steel structure, less land occupation and low building requirement
Quick installation, fast plant construction. Only one week needed.
|
Model |
THYS0.5 |
1.0 |
2.0 |
|
(T/Y) |
3000 |
5000 |
10000 |
|
(KW) |
18.75 |
22.25 |
30.05 |